Which of the following is how can you identify a terminal cost item on the CBS register page? (Select all that apply.)
The row is highlighted a different color
A symbol displays on certain cost item fields
The row is indented
The ‘Is Terminal’ column is checked
When moving a cost item to be above another cost item at the same level, which icon should display when you drag and drop the cost item?
The one with a subordinate bar
The one with three equal bars
The one with an equal sign
The one with a plus sign
If you make changes to your spreadsheet, you must _____ the spreadsheet prior to importing it into Control.
close
copy
save
refresh
As a result of this lesson, you can:
Explain the Cost Breakdown Structure and its purpose
Create, arrange and delete cost items
Import cost items